Power

ELECTRIC POWER

01

High voltage transmission and transformation
(66kV ~ 765kV) construction

We are carrying out the turn-key project of underground cable lines based on our knowledge and experience in high-voltage underground transmission and transformation (66kV ~ 765kV), which is the artery of the national key industry. Based on this, we provide complete services for specialized engineering, design, construction and post-construction management. In recent years, there is a tendency to improve the quality of cable accessories and to make plug-in for simplification of construction. Accordingly, EPE received a certificate of Pfisterer, SWCC Showa, and NKT connection construction through self-access education and overseas training. Through these experiences, EPE have provided the best possible solutions for projects such as Korea Electric Power Corporation (KEPCO) in Korea, Sakhalin Energy Investment Company (SEIC) in Russia, OPF SITE PJT (Worlet Parsons Group) in UK and SEIC LNG site (Chiyoda) where we could have lots of experiences in construction with quality.
  • PERFORMANCE KEPCO'S extra high-Voltage Underground Cable installation projects

    • 2011. 154kV Seo-sejong Underground Transmission Line Construction
    • 2011. 154kV Nobyeon-hyomok Underground Transmission Line Construction
    • 2012. 154kV Nobyeon-hyomok Underground Transmission Line Construction
    • 2012. 154kV Seoinchoen-Wanggil Underground Transmission Line Construction
    • 2013. 154kV Jukrim-soecheongju Underground Transmission Line Construction
    • 2013. 154kV Dongsuwon-Sinsuwon Underground Transmission Line Construction
    • 2013. 154kV Nonhyeon-Nonil Underground Transmission Line Construction
    • 2013. 154kV Minam-Dongrea Underground Transmission Line Construction
    • 2013. 345kV Sam-chuck G/P S/Y 154kV power cable installation Construction
    • 2014. 154kV Sandong-Sunsan Underground Transmission Line Construction
    • 2015. 154kV Namsa-Jinwi Underground Transmission Line Construction
    • 2015. 154kV Osan S/S Underground Transmission Line Construction
    • 2015. 154kV Namsa-Jinwi(A-gok) Underground Transmission Line Construction
    • 2016. 154kV Seonsan-Angyae Underground Transmission Line Construction
    • 2016. 154kV Hwagok-Gayang Underground Transmission Line Substitute Construction
    • 2016. 154kV Bukwonju S/S Sh.c power cable installation Substitute Construction
    • 2017. 154kV Seopusan-Sinpyeong, YK Underground Transmission Line Substitute Construction
    • 2017. 154kV Andong-Pungsan Underground Transmission Line Construction
    • 2017. 154kV Dongnam-Wirye Underground Transmission Line Construction
    • 2018. 154kV Sinbupyeong-Jungdong etc 3Underground Transmission Line Construction
    • 2018. 154kV Wonheung-Susaek Underground Transmission Line Construction

02

Specializing in Underground Transmission
(2011.1.3 KEPCO)

EPE has acquired the qualification as an underground transmission construction company due to the separation of construction contract from jointed contract of material supply & underground transmission construction which was limited to only the cable & accessories companies in KEPCO, Thereby we have been providing even better construction quality. image
  • PERFORMANCE New electric power Technology applied projects

    • 2007. 154kV Donglae-Yeonsan Underground Power Transmission Line Long-span Pulling Construction
    • 2007. 154kV Guam Divergence Underground Power Transmission Line Long-span Pulling Construction
    • 2008. 154kV Seodaemun-Eunhyeon Underground Power Transmission Line Long-span Pulling Construction
    • 2008. 154kV Jangjae Divergence Underground Power Transmission Line Long-span Pulling Construction
    • 2009. 154kV Sinyanjae-Gyodae Underground Power Transmission Line Long-span Pulling Construction
    • 2010. 154kV Gimjae Divergence Underground Power Transmission Line Long-span Pulling Construction
    • 2010. 154kV Seoinchoen-Cheongna Underground Power Transmission Line Long-span Pulling Construction
    • 2011. 154kV Gwanggyo Newtown Underground Power Transmission Line Long-span Pulling Construction
    • 013. 154kV Dongbusan-Yangjeong Underground Power Transmission Line Long-span Pulling Construction

03

Installation of heavy electric equipment

We are responsible for the installation, assembly, and commissioning of the 22kV ~ 154kV power board company's substation equipment from the hydroelectric and thermal power generation facilities for the power transmission and transformation of KEPCO to smooth power supply.

MAIN PERFORMANCE AREA

  • Circuit breaker installation and precise check
  • Maintenance
  • Installation and modification of switchboard
  • GIS, MTR installation and inspection
image
  • PERFORMANCE professional Transmission Company projects

    • 2010. Jungbu P/O 170kV GIS Precision Inspection Construction
    • 2011. Seoulheadquarter Direct 170kV GIS Precision Inspection Construction
    • 2012. Seongdong Direct 170kV GIS Precision Inspection Construction
    • 2013. Sintaebaek 800kV GIS Usually Inspection Construction
    • 2015. Jungbu P/O 345kV GIS Precision Inspection Construction
    • 2016. Sinchon S/S 154kV Long-term Unused GIS Substitution Construction
    • 2013. 154㎸ Gapyeong S/S Precision Inspection Construction
    • 2014. 345kV Yeongdeungpo S/S #3Sh.R GIS Installation Construction
    • 2014. 154kV Suseo S/S #4MTr. GIS Installation Construction
    • 2016. Gangnam P/O 170kV GIS Precision Inspection Construction
    • 2016. Icheon S/S 154kV #2Sh.C Precision Installation Construction
  • PERFORMANCE KEPCO'S Plug-In Termination installation projects

    • 2006. 154kV Youkgok S/S #3 MTr. 1st Cable Installation and PFISTERER's Termination Construction
    • 2006. 154kV Sunwha S/S #3 MTr. Cable Termination Construction
    • 2006. 154kV Deungchon S/S #3 MTr. Cable Termination Construction
    • 2007. 154kV Jisa S/S Power Cable Installation Construction
    • 2008. 154kV Jungang S/S #3 MTr. 1st Cable Termination Construction
    • 2009. 154kV Sangbong S/S MTr. 1st Cable Termination Construction
    • 2012. 154kV bukpyeong S/S Power Cable Installation Construction
    • 2013. 154kV Banghak S/S Power Cable Installation Construction
    • 2013. 154kV Cheongwon S/S Power Cable Installation Construction
    • 2014. 154kV Gwangjang S/S MTr. 1st Power Cable Installation Construction
    • 2015. 154kV Muju S/S Sh.C Underground Cable Installation Construction
    • 2015. 154kV Gwangjang S/S #2MTr. Power Cable Substitute Construction
    • 2015. 345kV Singimje S/S ESS Underground Cable Installation Construction
    • 2016. 154kV Garak S/S Power Cable Installation Construction
    • 2017. 154kV Bangsan S/S #3M.Tr Power Cable Installation Construction
    • 2017. 154kV Samsung S/S #2MTr. Power Cable Substitute Construction
    • 2018. 154kV Gwangjang S/S MTr. 2nd Power Cable Substitute Construction
  • PERFORMANCE NKT

    • 2017. 154kV Samsongjisa Transmission Transfer Construction

04

Responsibility supervision service

EPE is doing its best to carry out supervision service that it has won by utilizing abundant supervising experience and excellent supervisory staff. We will systematically fulfill the responsibilities of the supervisor through technical guidance, on-site confirmation and inspection to ensure that the construction of excellent quality before, planned job schedule air economically and safely.

What is electric work supervision?

The main work of electric work supervision is review of design documents, construction supervision of construction supervisor, construction confirmation, and process control. It means checking and supervising whether the contractor of the construction works appropriately according to the design documents and whether it is appropriate for the materials used.

MAIN PERFORMANCE AREA

image
image
image

RESPONSIBILITY SUPERVISION TARGET ORGANIZATION

  • State, Local Government, Government Investment Organization
  • Appearances of national and local governments
  • Facilities managed by the state, local government or government investment organization.
  • Type I and Type II facilities under the Act on Promotion of Private Capital for Social Indirect Facilities
  • PERFORMANCE Responsibility-Supervision Service

    • 2011. 154kV Singimje-Jeonju Underground Transmission Line Responsibility-Supervision Service
    • 2014. 154kV Incheon CC- Posco CC Underground Transmission Line Responsibility-Supervision Service
    • 2017. 154kV Anseong-Namanseong Underground Transmission Line Responsibility-Supervision Service

05

Distribution uninterrupted construction

LIVE LINE WORK

  • New construction of Pole
  • Replacement of insulator (suspension, pin)
  • New and replacement of COS and drop wire
  • Creation and demolition of jumpers
  • Installation and demolition of breakers, switches, lightning arresters
  • Detection of faulty insulator

CONSTRUTION METHOD FOR TEMPORARY TRANSMISSON

  • Construction method for switchgear for construction
  • Method for By-pass cable
  • Construction method for mobile transformer
  • Construction method for generator for construction
  • Method for temporary connection line
  • Method for WHM bypass

METHOD FOR DIRECT TRANSMISSION

  • Installation method for moving wire
  • Transmission method for uninterrupted branch line
  • Transmission method for uninterruptible transformer
PDF DOWNLOAD